Staircase Installation in Hove

Staircase installation in Hove for replacements, new builds and loft conversions. Rise, going and headroom all have to meet building regulations, so we measure the opening carefully before anything is made.

Measuring the Opening

A staircase is set by the floor to floor height and the space available. We measure both, then work out the number of steps so every rise is identical. A step that is even a few millimetres different is the one people trip on. Those figures go to the maker.

Staircase installation in Hove with a new oak flight and timber spindles

More Information

Building Regulations for Stairs

Domestic stairs have limits on rise, going, pitch and headroom, plus rules on spindle gaps for child safety. Loft stairs get some flexibility but still need signing off. We work to the regulations from the start rather than fixing problems at inspection.

Balustrades, Handrails and Spindles

The balustrade changes how a staircase looks more than the treads do. Timber spindles, glass panels and metal balusters all fit the same frame. Handrail height is set by regulations. We can match existing joinery if you are replacing one flight in an older house.

Frequently Asked Questions

Can you replace a staircase in an occupied Hove house?

Yes. Most replacements take two to three days, and we usually keep temporary access upstairs overnight. The old flight comes out, the opening is checked against the new stair, then the flight is fitted, with balustrade and finishing to follow.

How long does staircase installation take?

Allow four to six weeks from measuring to fitting, because the stair is made to your figures. Fitting itself is two to three days for a straight flight and longer with winders or a landing balustrade. We give you both dates when we quote.

Do loft conversion stairs need to meet the same rules?

Mostly yes, though loft stairs get some allowance for space saving designs where there is no alternative. Headroom, pitch and a safe balustrade still apply, and building control will check them. We design the flight alongside the conversion so it passes first time.

About us

Hugo Developments has fitted staircases in Hove homes for 10 years, both new flights and replacements in occupied houses. Our lead carpenter is NVQ Level 3 qualified. We plan the work so you keep access upstairs where possible, and we agree the geometry with you before anything is ordered.

  • NVQ Level 3 qualified carpentry team

  • Same day response to every enquiry

  • Free written quotes, no obligation

  • 10 years working on Hove homes

  • Carpentry, building and fitted furniture in one team

Our reviews